RO for a food production factory in Bahrain2018-07-21T12:12:49+00:00

RO for a food production factory in Bahrain

Solution: Industrial process

After-Sales Support for Water Treatment in Bahrain Advanced Watertek provides excellent after sales support. With our presence in the Middle East, our team of qualified technicians and service experts are always ready to provide immediately on-site support. Please contact our Sr. Sales Engineer Anas on anas.e@advancedwatertek.com or +971505503316 if you have any enquiries regarding water treatment and desalination in Bahrain.

Client’s Challenge

Our client, a global F&B company, was looking for a reliable water treatment system for their second production facility in Bahrain. They were not satisfied with the system at their current production facility, and were therefore looking for a new supplier.

Reliability and quality were the most important selection criteria for the client. Producing food products for very competitive markets, they can’t afford interruption in the production. For instance a shortage of supply, even for a short time, will therefore immidatly affected their markets share. Hence they sourced a system that would perform 100%, irrespective of the operating conditions. In addition, because of the site restrictions they wanted the skid-mounted system to be assembled and customised at site.

Client’s water

The feed water is chlorinated municipality water. The system will treat water for the following applications:

  • Production process

  • The process equipment

  • Cooling towers

Our Solution

We designed, manufactured and installed two Reverse Osmosis (RO) brackish water units, both producing 2 x 1400 m³/day. Due to the presence of Biochemical Oxygen Demand (BOD) and Chemical Oxygen Demand (COD) in the raw water, we also incorporated fouling resistance membranes in our design.

As per our policy, we only sourced and provided high quality parts. Similarly, we also did test each component above the given design parameters on-site to ensure the reliability of the machines.

Furthermore, our team of operators, technicians and engineers spent 20 days at the site, to modify and complete the installation. As a result, we met all the requirements from the client.

Advanced Watertek Scope of Work

  • System capacity:                                2 x 1400 m³/day

  • Type:                                                  Skid Mounted

  • No. of trains:                                      Two

  • Pre-Treatment Flow Rate:                73.0m³/hrper Train

  • Product Flow Rate:                            58.4 m³/hr (1400 m³/day) per train

  • Average Recovery:                            80%

  • Expected Product Water TDS:         <40ppm @ 25°C

  • Operating Hours/Day:                      24/7

  • Mode of operation:                           Manual

  • Design TDS:                                       400 ppm

  • Power Supply:                                   380 – 415V, 3Phase, 50Hz

After-Sales Support for Water Treatment in Bahrain

Our aim is to have your system to run for decades. Hence, we provide excellent after sales support. With our presence in the Middle East, our team of qualified technicians and service experts provide immediately on-site support in case of a break-down.

Want to know more?

Please contact our Sr. Sales Engineer Anas on anas.e@advancedwatertek.com or +971505503316 if you have any enquiries regarding water treatment and desalination in Bahrain.